Lifting tackles are critical components that must undergo a structured inspection process to ensure they are free from defects and capable of handling their rated loads

  • Chain showing cracks, stretches, severe nicks, gouges, welding splattered or deformed master links, coupling links, chains must be discarded.
  • One leg of a double or triple chain sling is longer than the others must be discarded.
  •  Chain size at any point of any link is less than stated in the chart as per norms must be discarded
  • Acid or caustic burns on the synthetic sling.
  • Melting, charring, snags, punctures, tears, or cuts of any part of the synthetic sling’s surface must be discarded.
  • Stitching is broken or worn.
  • Stretched synthetic slings must be discarded.
  • Hooks have been opened more than 25% of the normal throat opening measured at the narrowest point or twisted more than 10 degrees from the plane of the unbent hook.
  • Inspect for damage, distortion and cracking.
  • Look for worn or flattened threads, rusting freedom of moving parts.
  • Check that all rivets etc, are firmly in place.
  • Test that the block will lock when subject to the designated load.
  • Ensure that all moving parts are free and that there is no contamination inside the block.
  • Carry out a visual inspection to ensure that the pulley wheels are of the correct size for the ropes.

  1. Purpose of Inspection: Clearly state the purpose and scope of the inspection.
  2. Date and Time of Inspection: Mention the date, time, and location of the inspection.
  3. Inspection Team: List the names and designations of the inspection team members.
  4. Documents Required for Inspection: List the required documents, such as design, drawings, certificates, etc.
  5. Inspection Activities: Describe the inspections and tests conducted during the inspection.
  6. Findings and Recommendations: Summarize the inspection findings and recommendations.
  7. Inspection Report: Attach a copy of the inspection report.
  8. Conformity and Non-Conformity: Mention any conformity and non-conformity observed.
  9. Corrective Action: Outline the corrective action plan for non-conformities.
  10. Inspection Frequency: Specify the frequency and schedule of inspections.
  11. Responsible Person: Identify the person responsible for the inspection.
  12. Inspection Records: Describe how inspection records will be maintained.